Pages

Jan 29, 2015

USAF Identifies Boeing 747-8 For Next Air Force One

Secretary of the Air Force, has determined the Boeing 747-8 will serve as the next presidential aircraft, commonly known as Air Force One.
“The Boeing 747-8 is the only aircraft manufactured in the United States (that), when fully missionized, meets the necessary capabilities established to execute the presidential support mission, while reflecting the office of the president of the United States of America consistent with the national public interest.”
Analyses of the capability requirements conclude a four-engine, wide-body aircraft is required to meet the needs of the Air Force One mission. Market research determined there are two four-engine platforms that could meet the requirements; the 747-8 manufactured by Boeing in the state of Washington, and the A380 manufactured by Airbus in Toulouse, France.
The decision, made official through a Determinations and Findings document, authorizes the commercial aircraft purchase by other than full and open competition. This decision, in conjunction with the notification of the Air Force’s intent to award a sole source contract to Boeing for the modification of the 747-8, allows discussions with Boeing that will likely lead to a contract for the aircraft platform as well as the modifications necessary to missionize the aircraft.
This decision is not a contract award to procure 747-8 aircraft. It's still needed to finalize the overall acquisition strategy and conduct risk-reduction activities with Boeing to inform the engineering and manufacturing development contract negotiations that will define the capabilities and cost.
The Air Force wants to own enough of the technical baseline to permit competition for sustainment throughout the aircraft’s planned 30-year life cycle..
The current fleet of VC-25 presidential aircraft has performed exceptionally well, but it is required an upgrade. Parts obsolescence, diminishing manufacturing sources and increased down times for maintenance are existing challenges that will increase until a new aircraft is fielded.
af.mil

No comments:

Post a Comment