Pages

Oct 4, 2015

F-35C Kick off Second Phase of At Sea Development Testing

USS Dwight D. Eisenhower (CVN 69) (Ike) accomplished its first arrested landing of an F-35C Lightning II carrier variant, Oct. 2.
The arrested landing is part of the second phase of at-sea Developmental Testing (DT-II) for the F-35C, which is expected to last two weeks. These test phases ensure aircraft meet specifications and identify mission critical issues sufficiently early in the test phase to deliver fully capable aircraft in time for their scheduled initial operating capability (IOC).
The purpose of DT-II is to test the suitability and integration of the F-35C in an at-sea environment. The F-35 Patuxent River Integrated Test Force (ITF) will run through a series of tests designed to increase the aircraft's operability at sea. The Ike crew partnered with the Patuxent River ITF test team to ensure the ship was prepared to receive the aircraft.
navy.mil

No comments:

Post a Comment