Translate

Nov 28, 2015

NAVANTIA Delivers Final Batch of Four Landing Crafts to Australia

Navantia has the pleasure in delivering to the Commonwealth in Sydney the final batch of four LLCs. This is a major achievement, where Navantia has played an important role – that of Prime Contractor for the first time in an Australian program. Since 2007, Navantia has been working in three important programs for the ADF, namely the Air Warfare Destroyers (AWDs), Landing Helicopter Docks (LHDs), and the LHD Landing Craft (LLCs), under different contractual schemes to deliver to the best of its ability.
On 16th December 2011, Navantia signed a contract with the then Defence Materiel Organisation (DMO) under JP 2048 Phase 3 to build and deliver twelve LHD Landing Craft (LLCs) to the Commonwealth. All twelve have now been delivered to HMAS WATERHEN in Sydney on or ahead of schedule and to budget. The LLCs were built and tested in Cádiz, Spain, and shipped out to Australia.
Navantia understands that the first eight units are in operation with the RAN and are performing to the full satisfaction of Navy, having achieved various missions during sea trials with HMAS CANBERRA, which has also been commissioned into the RAN. Her sister ship, HMAS ADELAIDE, is due to be commissioned in Sydney on 4th December 2015.

No comments:

Post a Comment