HAL and BAE Systems have signed an agreement to support Hawk Mk 132 advanced jet trainers (AJTs) and SEPECAT Jaguar fighters.
A Memorandum of Understanding (MoU) signed by the two companies features the upgrade of the Hawk Mk 132s, the development of a "combat" Hawk aircraft for Indian and export markets, as well as "maintenance solutions" to support Indian Armed Forces' Hawk and Jaguar fleets.
janes
Translate
Showing posts with label BAE. Show all posts
Showing posts with label BAE. Show all posts
May 28, 2015
HAL and BAE sign Hawk upgrade MoU
Oct 20, 2014
ROKAF F-16 Upgrade: Problems With S. Korea-BAE Deal Could Open Door to Lockheed
South Korea is threatening to break an agreement with BAE Systems to upgrade its fleet of KF-16s, opening a window of opportunity for competitor Lockheed Martin to reclaim its dominance in theF-16 upgrade market.
The Defense Acquisition Program Administration (DAPA) selected BAE Systems’ North American subsidiary in December 2012 as prime integrator to take charge of software and hardware upgrades for 134 KF-16 aircraft. It represented the first time any company had beat Lockheed, the original producer of the F-16, for upgrades to the jet.
defensenews
The Defense Acquisition Program Administration (DAPA) selected BAE Systems’ North American subsidiary in December 2012 as prime integrator to take charge of software and hardware upgrades for 134 KF-16 aircraft. It represented the first time any company had beat Lockheed, the original producer of the F-16, for upgrades to the jet.
defensenews
Etiquetas:
BAE,
BAE SYSTEMS,
F-16,
LOCKHEED MARTIN,
NORTHROP GRUMMAN,
ROKAF,
SOUTH KOREA,
UNITED STATES,
USA
Apr 6, 2014
SAAF Hawk fleet grounded
The South African Air Force has ground their Hawk trainer fleet following the crash of a jet whilst landing last Thursday.
The BAE Systems Hawk Mk 120 jet trainer, operated by 85 Combat Flying School, was performing a ‘touch and go’ at AFB Makhado when it experienced a control problem.
Unconfirmed reports indicate that the control stick ‘locked’ shortly before touch-down, resulting in the aircraft slamming the front wheel onto the runway, bouncing and then hitting the runway again with the front wheel. This resulted in the front wheel breaking off and the Hawk sliding down the runway before coming to a halt.
Neither of the two crew aboard, who deploying the drag chute after the nose-wheel broke off in order to slow the aircraft, were injured.
As the damaged aircraft blocked the runway, other aircraft that were still in the air were forced to land on the taxiway. This was safely accomplished as when the airbase was built in the 1980’s, the taxiway was designed to operate as a secondary runway in the event of the main runway being blocked or damaged.
AFB Makhado is situated near the town of Louis Trichardt in the Limpopo Province. 85 Combat Flying School is equipped with the remaining 23 Lead-In Fighter Trainer (LIFT) Hawk jets of the 24 delivered as part of the 1999 Strategic Defence Package (SDP).
The other flying squadron operating from the base is 2 Squadron, equipped with the SAAB Gripen advanced fighter.
saairforce
The BAE Systems Hawk Mk 120 jet trainer, operated by 85 Combat Flying School, was performing a ‘touch and go’ at AFB Makhado when it experienced a control problem.
Unconfirmed reports indicate that the control stick ‘locked’ shortly before touch-down, resulting in the aircraft slamming the front wheel onto the runway, bouncing and then hitting the runway again with the front wheel. This resulted in the front wheel breaking off and the Hawk sliding down the runway before coming to a halt.
Neither of the two crew aboard, who deploying the drag chute after the nose-wheel broke off in order to slow the aircraft, were injured.
As the damaged aircraft blocked the runway, other aircraft that were still in the air were forced to land on the taxiway. This was safely accomplished as when the airbase was built in the 1980’s, the taxiway was designed to operate as a secondary runway in the event of the main runway being blocked or damaged.
AFB Makhado is situated near the town of Louis Trichardt in the Limpopo Province. 85 Combat Flying School is equipped with the remaining 23 Lead-In Fighter Trainer (LIFT) Hawk jets of the 24 delivered as part of the 1999 Strategic Defence Package (SDP).
The other flying squadron operating from the base is 2 Squadron, equipped with the SAAB Gripen advanced fighter.
saairforce
Etiquetas:
BAE,
BAE HAWK,
SAAF,
SOUTH AFRICA,
SOUTH AFRICAN AIR FORCE
Feb 24, 2014
Time Running Out on Europe's Typhoon Orders
Production of the Eurofighter Typhoon may conclude at the end of 2017 if there are no further orders from the program's four partner nations or export customers.
Governments and industry are in discussions over the fate of the final order of Eurofighter Typhoon combat jets for the four partner nations involved in the program amid Germany’s plan to end its purchases early.
The British, German, Italian and Spanish governments are in negotiations with industry over whether to go ahead with part or all of what is known as the Typhoon Tranche 3B order.
An Italian source said the industry partners have given the governments a deadline to decide whether they wish to order Tranche 3B aircraft or not.
The four nations are on the hook for a total of 124 Tranche 3B aircraft for what is planned to be the last batch of the twin-engine planes to be delivered to the European partners.
With budget cuts across Europe biting into Air Force fighter jet numbers, analysts have for some time written off the possibility of a Tranche 3B order, unless export orders are counted as part of the commitment.
The governments might have to pay compensation to industry if they do not turn their longstanding commitment to buy the remaining Tranche 3 aircraft into a firm order.
Tranche 3 was split into 3A and 3B portions as a compromise among the four nations and industry in 2009, after the governments balked at committing to the entire remaining order for the fighter jet amid the deepening economic crisis in Europe and beyond.
Britain has the largest 3B commitment at 48 aircraft, followed by Germany with 37, Italy with 25 and Spain with 14. All but the Germans have deep public finance problems, which have led to reductions in defense spending.
The first of 112 Tranche 3A aircraft ordered by the four nations was test flown by BAE for the first time late last year.
Assembly lines across the four nations will start going quiet at the end of 2017 if there are no further orders from the partner nations or export customers.
Executives, though, say they are confident production of the Typhoon will continue well beyond 2020 on the back of export orders.
An additional order for Saudi Arabia and a possible deal with Bahrain look like the best prospects in the export market.
The fighter also is competing in Qatar and Kuwait, and secondhand planes are being offered for lease by Malaysia.
India remains a potential customer if France’s Dassault Aviation fails to seal long-running negotiations to supply the Rafale.
The United Arab Emirates could also re-emerge as a customer, even though the gulf state and BAE broke off negotiations in December for a possible 72-jet order.
More than 400 Tranche 1 and Tranche 2 Typhoons have been delivered to the four partner nations, plus export customers Austria and Saudi Arabia. The aircraft has also been purchased by Oman.
defensenews
Governments and industry are in discussions over the fate of the final order of Eurofighter Typhoon combat jets for the four partner nations involved in the program amid Germany’s plan to end its purchases early.
The British, German, Italian and Spanish governments are in negotiations with industry over whether to go ahead with part or all of what is known as the Typhoon Tranche 3B order.
An Italian source said the industry partners have given the governments a deadline to decide whether they wish to order Tranche 3B aircraft or not.
The four nations are on the hook for a total of 124 Tranche 3B aircraft for what is planned to be the last batch of the twin-engine planes to be delivered to the European partners.
With budget cuts across Europe biting into Air Force fighter jet numbers, analysts have for some time written off the possibility of a Tranche 3B order, unless export orders are counted as part of the commitment.
The governments might have to pay compensation to industry if they do not turn their longstanding commitment to buy the remaining Tranche 3 aircraft into a firm order.
Tranche 3 was split into 3A and 3B portions as a compromise among the four nations and industry in 2009, after the governments balked at committing to the entire remaining order for the fighter jet amid the deepening economic crisis in Europe and beyond.
Britain has the largest 3B commitment at 48 aircraft, followed by Germany with 37, Italy with 25 and Spain with 14. All but the Germans have deep public finance problems, which have led to reductions in defense spending.
The first of 112 Tranche 3A aircraft ordered by the four nations was test flown by BAE for the first time late last year.
Assembly lines across the four nations will start going quiet at the end of 2017 if there are no further orders from the partner nations or export customers.
Executives, though, say they are confident production of the Typhoon will continue well beyond 2020 on the back of export orders.
An additional order for Saudi Arabia and a possible deal with Bahrain look like the best prospects in the export market.
The fighter also is competing in Qatar and Kuwait, and secondhand planes are being offered for lease by Malaysia.
India remains a potential customer if France’s Dassault Aviation fails to seal long-running negotiations to supply the Rafale.
The United Arab Emirates could also re-emerge as a customer, even though the gulf state and BAE broke off negotiations in December for a possible 72-jet order.
More than 400 Tranche 1 and Tranche 2 Typhoons have been delivered to the four partner nations, plus export customers Austria and Saudi Arabia. The aircraft has also been purchased by Oman.
defensenews
Etiquetas:
AIRBUS DEFENCE AND SPACE,
AUSTRIA,
BAE,
DASSAULT,
EUROFIGHTER,
FINMECCANICA,
FRANCE,
ITALY,
KUWAIT,
MALAYSIA,
OMAN,
QATAR,
RAFALE,
SAUDI ARABIA,
SPAIN,
Typhoon,
UK,
UNITED KINGDOM
Oct 19, 2013
Poland Invites Lockheed, BAE, Alenia To Bid For Jet Trainers
Poland has invited Lockheed Martin, BAE Systems and Alenia Aermacchi to bid in an upcoming Polish Air Force advanced jet trainer (AJT) aircraft competition.
Under the plan, the Polish ministry will place an order for eight jet trainers and related infrastructure and equipment with an option for an additional four aircraft. The new jet trainers are intended to replace Poland’s TS-11 Iskra aircraft built by Sikorsky’s local subsidiary PZL Mielec.
In 2011, the ministry canceled its first tender for the aircraft after BAE Systems withdrew its Hawk advanced jet trainer from the contest. Four bidders were left competing for the Polish contract: Alenia Aermacchi, Korea Aerospace Industries and Lockheed Martin, Czech Republic’s Aero Vodochody, and Finland’s Patria.
defensenews
Under the plan, the Polish ministry will place an order for eight jet trainers and related infrastructure and equipment with an option for an additional four aircraft. The new jet trainers are intended to replace Poland’s TS-11 Iskra aircraft built by Sikorsky’s local subsidiary PZL Mielec.
In 2011, the ministry canceled its first tender for the aircraft after BAE Systems withdrew its Hawk advanced jet trainer from the contest. Four bidders were left competing for the Polish contract: Alenia Aermacchi, Korea Aerospace Industries and Lockheed Martin, Czech Republic’s Aero Vodochody, and Finland’s Patria.
defensenews
Etiquetas:
AERO VODOCHODY,
ALENIA,
BAE,
BAE HAWK,
CZECH REPUBLIC,
FINLAND,
ISKRA,
KAI,
LOCKHEED MARTIN,
M-346,
PATRIA AVIATION OY,
Poland,
POLISH AIR FORCE,
SOUTH KOREA,
TS-11,
UNITED STATES,
USA
Jul 8, 2013
BAE Systems UK Awarded Contract for RAAF BAE Hawk Upgrade
Minister for Defence Materiel announced that BAE Systems UK has been awarded a contract to upgrade the Lead-In Fighter Hawk fleet.
defense-studies
defense-studies
Etiquetas:
AUSTRALIA,
BAE,
BAE HAWK,
RAAF,
ROYAL AUSTRALIAN AIR FORCE
Feb 17, 2013
BAE hit by delay on Saudi jet deal
BAE Systems is to reveal that 2012 was a weaker-than-expected year in profit terms as a result of delays in agreeing a price with Saudi Arabia for its Typhoon fighter jets.
The defence giant will publish full-year results for 2012 on Thursday, and analysts are forecasting a rise in revenue to around £18.7bn from £17.8bn.
Pre-tax profit is forecast to rise to £1.63bn from £1.47bn.
However, The Sunday Telegraph understands results will come in below City expectations as BAE continues negotiations on the pricing of a contract to supply 72 jets to the Royal Saudi Air Force. It is a government-to-government deal known as “Salam” and worth roughly £4.5bn in total.
telegraph
Etiquetas:
BAE,
EUROFIGHTER,
ROYAL SAUDI AIR FORCE,
SAUDI ARABIA,
Typhoon,
UK,
UNITED KINGDOM
Feb 15, 2013
EADS-BAE merger lives on
Airbus parent EADS is poised to reveal a dramatic rise in profitability, having netted more than €2.1 billion ($2.8 billion) for shareholders last year, up from little more than €1 billion in 2011 and only €533 million in 2010.
EADS is unable to comment yet on 2012 performance, but revenue has risen steadily for several years to €49.1 billion in 2011, and Airbus in 2012 delivered a record 588 aircraft. However, profitability has been low and Louis Gallois, who retired in 2012 as chief executive, had made improvement a priority. Although the group's "Vision 2020" bid to reduce its reliance on Airbus - historically accounting for some two-thirds of sales - has been thwarted by a booming civil aircraft market, analysts have praised cost reduction efforts.
EADS itself is unlikely to pursue another mega-merger soon, but its dalliance with BAE has surely focused minds in other European boardrooms; transformative deals involving big players Safran, Thales and Finmeccanica have been discussed for years and may now look timely.
flightglobal
Etiquetas:
AIRBUS,
AIRBUS MILITARY,
BAE,
EADS,
GERMANY,
ITALY,
SPAIN,
UNITED KINGDOM
Dec 21, 2012
Oman to obtain 12 Typhoons, eight Hawks
BAE Systems has secured a deal for 12 Typhoon Tranche 3 fighters and eight Hawk advanced jet trainer aircraft, with deliveries to start in 2017.
Oman will be the seventh air force to operate the Typhoon, says BAE. Other operators are the UK, Germany, Italy, Spain, Austria and Saudi Arabia.
flightglobal, BY GREG WALDRON
Etiquetas:
BAE,
BAE HAWK,
EUROFIGHTER,
OMAN,
RAFO,
ROYAL AIR FORCE OF OMAN,
Typhoon,
UK,
UNITED KINGDOM
Dec 6, 2012
Eurofighter Typhoon releases first Meteor missile
A Eurofighter combat aircraft has released an MBDA Meteor beyond visual-range air-to-air missile for the first time, with the milestone having been achieved over a UK test range on 4 December.
Performed by a BAE Systems test pilot using the UK's Typhoon Instrumented Production Aircraft 1, the event included ejecting a telemetry-equipped Meteor test round from a rear-fuselage missile station over the Qinetiq firing range in Aberporth, west Wales.
flightglobal
Nov 29, 2012
BAE Completes Upgrade of RAF Eurofighter Typhoons
Under the programme known as Retrofit 2, 43 Royal Air Force Typhoon aircraft have been upgraded to the Tranche 1 Block 5 standard.
defencetalk
Etiquetas:
BAE,
BRITAIN,
EF-2000,
EUROFIGHTER,
RAF,
ROYAL AIR FORCE,
UK,
UNITED KINGDOM
Nov 14, 2012
BAE Systems Delivers Its 300th F-4 Flying Drone for U.S. Air Force
The achievement is a significant milestone in the 16-year-long QF-4 program, which provides full-scale, remotely controlled aerial targets that the Air Force uses for weapons testing and aircraft training.
nosint.blogspot
baesystems
Etiquetas:
BAE,
BRITAIN,
QF-4,
UK,
UNITED KINGDOM,
UNITED STATES,
USA,
USAF
Hawk trainer compliant with USAF T-X requirements, says BAE
BAE Systems has responded to the US Air Force's draft key performance parameters (KPPs) for its nascent T-X jet trainer programme to replace the venerable Northrop T-38 Talon.
flightglobal
Etiquetas:
BAE,
BAE HAWK,
BRITAIN,
T-X,
UK,
UNITED KINGDOM,
UNITED STATES,
USA,
USAF
Oct 10, 2012
BAE SYSTEMS READY FOR LHD ARRIVAL
BAE Systems Director Maritime, Bill Saltzer said preparation works were complete and the Australian team are ready to start work on the next phase of the construction, as soon as it arrives at Williamstown in the next few weeks.
learn more
How Germany killed the merger of BAE and EADS
Statement from BAE Systems and EADS explaining why they have buried their plans to merge:
"Notwithstanding a great deal of constructive and professional engagement with the respective governments over recent weeks, it has become clear that the interests of the parties' government stakeholders cannot be adequately reconciled with each other or with the objectives that BAE Systems and EADS established for the merger."
learn more
EADS, BAE Systems Call Off Merger
The collapse of merger talks between EADS and BAE Systems raises serious questions about the future course of both companies and shows how much influence European governments have over EADS.
The two companies called off their planned merger Oct. 10, hours before the expiration of a deadline set by a British takeover commission. Executives mustered last-ditch efforts to save the deal, but it had become increasingly clear since late last week that political reservations could not be overcome.
learn more
Oct 3, 2012
The Royal Navy's fleet of Viking amphibious all-terrain vehicles is to be regenerated under a new £37m contract with BAE Systems
Used extensively by the Royal Marines, the 99 Viking BVS10 vehicles, which can be launched straight from the back of a ship and propelled through water before landing for a beach assault, are in line for a major overhaul by BAE Systems.
learn more
Etiquetas:
BAE,
ROYAL MARINES,
ROYAL NAVY.,
UK,
UNITED KINGDOM,
VIKING
Jan 18, 2011
Cancelar el Nimrod costará 200 millones de libras adicionales/ MoD to spend further £200m on axed Nimrod project

El Ministerio de Defensa Británico ha anunciado que invertirá 200 millones de libras en la cancelación de la modernización de nueve Nimrod, que en la versión Nimrod MRA4 de vigilancia y reconocimiento, iba a ser construida por BAE Systems, y que fue cancelada el pasado Octubre de 2010.
(leer más)
____________________________________
The Ministry of Defence (MoD) is to spend £200m on closing down the axed project to build nine new Nimrod spy planes, it has emerged.
The Nimrod MRA4 surveillance and reconnaissance planes were being built at BAE Systems sites in Stockport, Lancashire and East Yorkshire.
The project was ditched by the government in October's Defence
(read more)
Jan 17, 2011
Tres grupos aeronáuticos pugnan por construir futuro UAV para Francia y Reino Unido/Aerospace group battle to build european fighter drone

Tres grupos aeronáuticos compiten para el diseño y construcción de la futura aeronave no tripulada para ataque de según requerimiento conjunto de Francia y Reino Unido.
Las empresas son BAE Systems junto a Dassault Systems, Cobham y General Atomics y Airbus-EADS.
La nueva aeronave debe ser capaza de realizar misiones civiles como vigilancia d costas, además de seguridad e inteligencia.
(leer más)
__________________________________________
Three aerospace groups are competing to design and build the next generation of unmanned military attack aircraft for a £600 million ($952 million) proposal launched jointly by Britain and France.
The groups involved in the bid were BAE Systems partnered with France's Dassault Systems, a joint bid by Cobham and General Atomics and, thirdly, Airbus-owner EADS, which held partnership discussions with the missiles group MBDA and France's Thales.
The UAV (unmanned aerial vehicle) must be able to perform civilian duties, such as coastal surveillance or providing security and intelligence, as well as having offensive capability, the UK government said.
(read more)
Nov 4, 2010
Dassault y BAE desarrollarán aeronaves no tripuladas conjuntamente/ Dassault, BAE in talks to jointly develop UAV
BAE Systems y Dassault han confirmado las conversaciones encaminadas para desarrollar aeronaves no tripuladas para dotar al Reino Unido y Francia.
La medida viene tras el acuerdo recientemente firmado por ambos países para reforzar su colaboración militar, con el objetivo de reducir gasto de defensa, y por la muy posible cancelación del proyecto de aeronave no tripulada desarrollada por EADS Talarion.
(leer más)
________________________________
BAE Systems confirms that it is in talks with Dassault to jointly develop unmanned planes for Britain and France.
The move comes as the two countries adopt closer military ties to ease pressure on defence spending.
(read more)
La medida viene tras el acuerdo recientemente firmado por ambos países para reforzar su colaboración militar, con el objetivo de reducir gasto de defensa, y por la muy posible cancelación del proyecto de aeronave no tripulada desarrollada por EADS Talarion.
(leer más)
________________________________
BAE Systems confirms that it is in talks with Dassault to jointly develop unmanned planes for Britain and France.
The move comes as the two countries adopt closer military ties to ease pressure on defence spending.
(read more)
Etiquetas:
BAE,
DASSAULT,
EADS,
FRANCE,
FRANCIA,
REINO UNIDO .,
TALARION,
UAV,
UK,
UNITED KINGDOM
Subscribe to:
Posts (Atom)


