Bell Helicopter revealed the first full-scale mock-up of its V-280 Valor tiltrotor aircraft in Washington DC.
The model allows Army procurement officers to see firsthand Bell’s answer to the Army’s request for an aircraft under the Joint Multi-Role (JMR)/Future Vertical Lift (FVL) programme.
The V-280 will have a composite fuselage made by Spirit AeroSystems, a large-cell carbon-core wing, fly-by-wire controls and a V-shaped tail.
It also incorporates lessons the company learned from its V-22 Osprey tiltrotor, which Bell produced in partnership with Boeing.
The V-22 is used by the US Marine Corps and US Air Force.
flightglobal
Translate
Showing posts with label Joint Multi-Role/Future Vertical Lift (JMR/FVL) programme. Show all posts
Showing posts with label Joint Multi-Role/Future Vertical Lift (JMR/FVL) programme. Show all posts
Oct 22, 2013
Bell unveils V-280 Valor mock-up
Etiquetas:
BELL,
BELL V-280 VALOR,
BOEING,
Joint Multi-Role/Future Vertical Lift (JMR/FVL) programme,
OSPREY,
UNITED STATES,
US ARMY,
US MARINES,
USA,
USAF,
USMC,
V-22,
V-280
Jun 6, 2013
Bell V-280 Valor Selected for Army’s JMR-TD Program
Bell Helicopter, announced that the Bell V-280 Valor, its third generation tiltrotor design, has been selected by the U.S. Army for the Joint Multi-Role (JMR) Technology Demonstrator (TD) program. The Army is expected to award JMR-TD contracts by September 2013, with first flight scheduled for 2017.
textron
Etiquetas:
BELL,
BELL V-280 VALOR,
Joint Multi-Role/Future Vertical Lift (JMR/FVL) programme,
UNITED STATES,
US ARMY,
USA
EADS aborts on bid to develop speedy rotorcraft for US Army
EADS North America is withdrawing from the US Army's Joint Multi-Role/Future Vertical Lift (JMR/FVL) programme.
"We will withdraw from further consideration for the JMR/FVL concept development effort," writes chief executive officer of EADS North America in a letter addressed to assistant secretary of the army for procurement.
EADS faces financial constraints in light of the Congressional sequestration law that automatically cuts projected US defence outlays by 10% every year for 10 years and the implementation thereof.
Sequestration forced the army to reduce funding for the EADS UH-72A Lakota. The army had planned to buy 31 UH-72As in Fiscal 2014 and 10 the following year, but instead now plans to buy only 10 during the next fiscal year that begins on 1 October.
Etiquetas:
EADS,
EADS NORTH AMERICA,
Joint Multi-Role/Future Vertical Lift (JMR/FVL) programme,
LAKOTA,
UH-72,
UNITED STATES,
US ARMY,
USA
Subscribe to:
Posts (Atom)