Pakistan Prime Minister performed the inauguration of the manufacturing of Block 2 of JF-17 at Pakistan Aeronautical Complex.
Block 2 jets come with air-to-air refuelling capability, improved avionics, enhanced load carrying capacity, better weapon carriage and enhanced data link and electronic warfare capabilities.
Production of Block 2 is expected to continue till 2016 after which manufacture of Block 3 is planned which may have new engine and different weaponry.
The aircraft jointly produced by Pakistan and China in 2003 was inducted into the Pakistan Air Force in 2007.
dawn.com
No comments:
Post a Comment